Pre-Award Service

Quantity Take-Offs

Measured quantities prepared from drawings, specifications, schedules, geotechnical reports and tender documentation.

Accurate quantities form the foundation of a reliable tender. DX Civil prepares detailed take-offs from civil, structural and infrastructure drawings, specifications, schedules and geotechnical information.

Typical Measurements

  • Demolition quantities
  • Cut, fill and excavation volumes
  • Rock excavation and spoil export
  • Imported fill and pavement materials
  • Stormwater pipes, pits and structures
  • Kerb, gutter and footpaths
  • Asphalt and concrete pavements
  • Concrete, formwork and reinforcement
  • Retaining walls and civil structures
  • Piles, shotcrete and capping beams
  • Service trenches and utility corridors

Deliverables

  • Quantity take-off schedule
  • Marked-up drawings
  • Bill of quantities
  • Measurement assumptions
  • Drawing and revision register
  • Scope queries and identified discrepancies

All take-offs are based on the information supplied. Missing details, drawing inconsistencies and uncertain measurement rules are identified through queries, assumptions or qualifications.

Ready to talk about your tender?

Request an Estimating Quote